ANTI-STATIC FLOORING - DERBY
IRL Group were awarded the resin flooring contract by Galliford Try Construction in the new XWB Readiness Building project in PTF2 at the Derby site.
The works involved levelling out the existing floor to suit the level in the new extension using Sikafloor 91 heavy duty epoxy resin screed and thereafter applying Sikafloor 262 AS anti-static epoxy resin self smoothing system.
The Sikafloor 81 EpoCem surface DPM was applied to all fresh concrete. The finish conforms to BS8205 / FeRFA type 5.
Value £100,000.00
Project Manager Adrian Kelly was delighted that the works were completed on time by a professional IRL team.
FOR A QUICK & PROFESSIONAL QUOTE...

IRL are experts in industrial flooring, floor markings, industrial painting and industrial roofing. We will guide you throughout the entire process from preparation, to liaising with your Health and Safety Officer. Get in touch and we will advise you on the best solution for your project.