Another Busy Christmas
During the shutdown periods we successfully complete works for Clients in a range of industries where the need for continuous production is a must and windows for production to cease are limited to shutdown periods.
Our Clients come to us because they know they can rely on us to be prompt and efficient causing minimum disruption to their working pattern.
Here is a run down of what we have completed during the two week closure of Christmas and New Year 2015/16
________________________________________
Vehicle Manufacturing Plant
• 6000 sq metres Epoxy Coatings - Sikafloor 161/264
• 25 tonne Sika Level 30 Pump Screed Installed
• 7.2 miles Sikacor EG5 Line Marking
• 300 sq metres Sikafloor 91 Epoxy Screed
________________________________________
Rail Industry
• 1200 sq metres Sikafloor PurCem 20 9mm Screed
• 4000 sq metres Sikafloor 161/264 broadcast system
• 500 metres demarcation in Sikacor EG5
________________________________________
Major Plasterboard Manufacturer
• 2000 sq metres Sikacor EG5 Pallett Storage & Pedestrian Safe Routes
________________________________________
East Midlands Fashion House
• 200 sq metres Remmers Indu-color to timber deck
________________________________________
On a smaller scale but equally important to us .....
Food Manufacturing
• 4 sq metres Sikafloor Purcem 20
________________________________________
Automotives
• 70 sq metres Metal Loading Dock Sika Pronto RB58 System
________________________________________
FOR A QUICK & PROFESSIONAL QUOTE...

IRL are experts in industrial flooring, floor markings, industrial painting and industrial roofing. We will guide you throughout the entire process from preparation, to liaising with your Health and Safety Officer. Get in touch and we will advise you on the best solution for your project.
Contact Us